{"id":44662,"date":"2026-05-22T10:09:59","date_gmt":"2026-05-22T08:09:59","guid":{"rendered":"https:\/\/www.pk.hr\/palfinger-pa-19001-specialized-solution-for-bridge-inspection-access-and-maintenance\/"},"modified":"2026-05-22T11:00:55","modified_gmt":"2026-05-22T09:00:55","slug":"palfinger-pa-19001-specialized-solution-for-bridge-inspection-access-and-maintenance","status":"publish","type":"post","link":"https:\/\/www.pk.hr\/en\/palfinger-pa-19001-specialized-solution-for-bridge-inspection-access-and-maintenance\/","title":{"rendered":"PALFINGER PA 19001 \u2013 Specialized Solution for Bridge Inspection, Access and Maintenance"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Palfinger model PA 19001 is an advanced and multifunctional solution designed for bridge inspection, access and maintenance, as well as for demanding infrastructure applications. Developed from PALFINGER\u2019s decades of experience in hydraulic cranes and access systems, this specialized unit enables safe and efficient work in hard-to-reach areas. <\/p>\n\n<p class=\"wp-block-paragraph\">Depending on the customer\u2019s requirements and field of application, the PA 19001 Bridge Inspection Unit can be mounted on truck chassis, railway vehicles or Hi-Rail vehicles combining road and rail operation. This flexibility allows for a wide range of applications in road and railway infrastructure maintenance, as well as specialized infrastructure projects. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"782\" data-id=\"44630\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02-1024x782.jpg\" alt=\"\" class=\"wp-image-44630\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02-1024x782.jpg 1024w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02-300x229.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02-768x587.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02-570x435.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pregled-mostova-02.jpg 1178w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"630\" height=\"630\" data-id=\"44634\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03.jpg\" alt=\"\" class=\"wp-image-44634\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03.jpg 630w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03-300x300.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03-150x150.jpg 150w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03-270x270.jpg 270w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03-570x570.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-pristupna-jedinica-most-03-100x100.jpg 100w\" sizes=\"auto, (max-width: 630px) 100vw, 630px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"44638\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01-1024x683.jpg\" alt=\"\" class=\"wp-image-44638\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01-1024x683.jpg 1024w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01-300x200.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01-768x512.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01-570x380.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspection-mosta-01.jpg 1350w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\">Its extensive working range below and above bridge or rail level enables efficient access to bridges, overpasses, cable systems, high poles and other complex structures. The system has been engineered with a strong focus on safety, stability and operational functionality in demanding working environments. <\/p>\n\n<p class=\"wp-block-paragraph\">One of the key advantages of the PA 19001 is the removable third boom system, which allows the unit to be adapted for various types of work and used for selected crane operations as well. In this way, users benefit from a multifunctional solution combining access platform technology and hydraulic crane functionality. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"599\" data-id=\"44640\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-hi-rail-bridge-unit-05.jpg\" alt=\"\" class=\"wp-image-44640\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-hi-rail-bridge-unit-05.jpg 800w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-hi-rail-bridge-unit-05-300x225.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-hi-rail-bridge-unit-05-768x575.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-hi-rail-bridge-unit-05-570x427.jpg 570w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" data-id=\"44642\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspekcija-zeljeznickog-mosta-06.jpg\" alt=\"\" class=\"wp-image-44642\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspekcija-zeljeznickog-mosta-06.jpg 800w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspekcija-zeljeznickog-mosta-06-300x169.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspekcija-zeljeznickog-mosta-06-768x432.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-inspekcija-zeljeznickog-mosta-06-570x321.jpg 570w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"656\" height=\"600\" data-id=\"44644\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-radna-korpa-mostovi-07.jpg\" alt=\"\" class=\"wp-image-44644\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-radna-korpa-mostovi-07.jpg 656w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-radna-korpa-mostovi-07-300x274.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-pa19001-radna-korpa-mostovi-07-570x521.jpg 570w\" sizes=\"auto, (max-width: 656px) 100vw, 656px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\">The PA 19001 is an ideal solution for:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>municipal and infrastructure authorities<\/li>\n\n\n\n<li>bridge and road maintenance operations<\/li>\n\n\n\n<li>railway infrastructure companies<\/li>\n\n\n\n<li>specialized construction and service companies<\/li>\n\n\n\n<li>inspection and maintenance work on demanding structures<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong>PK-PALFINGER KRAN d.o.o. has a long tradition of working with this type of specialized equipment. Back in 2000, the company delivered the first PALFINGER bridge inspection unit in the region, used for inspection and maintenance operations on major infrastructure projects.  <\/strong><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"44654\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-1024x768.jpg\" alt=\"\" class=\"wp-image-44654\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-1024x768.jpg 1024w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-300x225.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-768x576.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-1536x1152.jpg 1536w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05-570x428.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-infrastrukture-05.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"44653\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-1024x768.jpg\" alt=\"\" class=\"wp-image-44653\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-1024x768.jpg 1024w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-300x225.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-768x576.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-1536x1152.jpg 1536w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01-570x428.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-inspekcija-mostova-01.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"44656\" src=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-1024x768.jpg\" alt=\"\" class=\"wp-image-44656\" srcset=\"https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-1024x768.jpg 1024w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-300x225.jpg 300w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-768x576.jpg 768w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-1536x1152.jpg 1536w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02-570x428.jpg 570w, https:\/\/www.pk.hr\/wordpress\/wp-content\/uploads\/2026\/05\/palfinger-radna-korpa-most-02.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\">The archive photographs show one of the early applications of PALFINGER bridge inspection systems on large infrastructure structures, including operations on bridges and demanding access positions above rivers and sea crossings. Systems of this type provide safe access to hard-to-reach structural areas, efficient bridge inspections, and maintenance operations with a high level of safety and functionality. <\/p>\n\n<p class=\"wp-block-paragraph\">Thanks to its flexibility, extensive working range and adaptability to various applications, the PALFINGER PA 19001 represents an efficient solution for modern infrastructure challenges.<\/p>\n\n<p class=\"wp-block-paragraph\">\ud83d\udcde +385 51 503 150<br\/>\u2709\ufe0f <a>info@pk.hr<\/a><br\/>\ud83c\udf10 <a href=\"http:\/\/www.pk.hr\/en\/\">www.pk.hr<\/a><br\/>\ud83d\udccd Kukuljanovo 317, 51227 Kukuljanovo, Hrvatska<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"PALFINGER Bridge Inspection Units \/ Railway - PA 19001\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/rqKHuNV8q8E?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Palfinger model PA 19001 is an advanced and multifunctional solution designed for bridge inspection, access and maintenance, as well as for demanding infrastructure applications. Developed from PALFINGER\u2019s decades of experience in hydraulic cranes and access systems, this specialized unit enables safe and efficient work in hard-to-reach areas. Depending on the customer\u2019s requirements and field of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44631,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[582],"tags":[1298,1297,1299],"class_list":["post-44662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bridge-inspection","tag-palfinger-bridge-inspection","tag-palfinger-crane-for-bridge-inspection"],"_links":{"self":[{"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/posts\/44662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/comments?post=44662"}],"version-history":[{"count":1,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/posts\/44662\/revisions"}],"predecessor-version":[{"id":44663,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/posts\/44662\/revisions\/44663"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/media\/44631"}],"wp:attachment":[{"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/media?parent=44662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/categories?post=44662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pk.hr\/en\/wp-json\/wp\/v2\/tags?post=44662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}