MONTERRA

Truck upgrade with Palfinger crane PK 27001 EH with max. hydraulic outreach 21,3 m and modular box 6200 mm long. The box has steel side walls with central columns. Truck upgrade is mounted on MB Arocs 2642 6×4. Truck is delivered to company Monterra from Rijeka.

»Oznake